Skip to main contentSkip to page footer

Expert report to the EC Water Framework Directive – B27, Bodelshausen (L 389) – Nehren (L 394)

Germany

Project Factsheet

For the planning of a bypass in the districts of Ofterdingen, Mössingen and Nehren, GefaÖ was commissioned by the Regional Council of Tübingen to prepare expert reports considering water law in accordance with §27 and §47 of the Water Resources Act (Wasserhaushaltsgesetz). This is to ensure that no deterioration of relevant water bodies is to be expected as a result of the project ("concept of no deterioration") and that the improvement of relevant water bodies is not prevented ("improvement requirement").

Key Facts
  • Description of the project and its impacts on surface water and groundwater bodies, based on technical and drainage planning.
  • Description of the baseline status of affected water bodies, including water quality, existing contamination, and water body classification.
  • Assessment of compliance with the objectives and requirements of the EC Water Framework Directive.
  • Calculations of concentrations of road salt and traffic-related pollutants as diffuse sources
  • Impact prediction by examining the prohibition of deterioration and the requirement for improvement for all affected water bodies
  • Presentation and assessment of compensatory measures and avoidance measures

Client

Regional Council of Tübingen (Regierungspräsidium Tübingen)

Baden‑Württemberg
Germany